Core Strategy – Additional Consultation on Proposed Changes
Four weeks consultation on the
Schedule of Proposed Changes (published in July 2010) and the
Schedule of Further Proposed Changes (published in October 2010) was undertaken between 15th October and 12th November 2010.
This consultation period is now closed. These two schedules set out changes proposed to the
Proposed Submission Core Strategy (pdf file) from 31st March 2010 to the start of the Examination Hearings.
Background
On 31st March 2010, the Council published the Proposed Submission Core Strategy. Representations were invited on the soundness of the Core Strategy between 31st March and 12th May.
The Core Strategy was then submitted to the Secretary of State for Examination on 21st July 2010.
Schedule of Proposed Changes (ref. CD1/02)
This schedule was one of the documents submitted to the Secretary of State for Examination. The changes proposed to the Core Strategy in this schedule, address matters including:
• Revocation of the South East Plan, and the associated removal of regional housing targets, and the regional processes for assessing the needs of gypsies, travellers and travelling Showpeople;
• Amendments to PPS3: Housing, which removed the national indicative minimum density of 30 dwellings per hectare, and changed the definition of Previously Developed Land;
• Representations received to the Proposed Submission Core Strategy (in response to the consultation that ended on 12th May 2010).
Schedule of Further Proposed Changes (ref. CD1/35)
After submission of the Core Strategy, the Council prepared a Schedule of Further Proposed Changes to deal with further editorial changes, factual updates and wording changes to improve the clarity of the supporting text and policy wording. This document was published on Friday 8th October, following the Pre-Hearing Meeting on 5th October.
Many of the changes set out in both Schedules are minor. However, in the interests of ensuring a clear and transparent consultation process, the Council, together with the Inspector appointed to examine the Core Strategy, decided to consult on all the changes in both schedules.
For ease of reference, the Council has produced a
Consolidated Version (2) (pdf file) of the Core Strategy (CD1/36), showing all proposed changes marked within the Proposed Submission Core Strategy document.
Representations
A 4-week period of public consultation on the two Schedules of Changes (
Schedule of Proposed Changes - pdf file and the
Schedule of Further Proposed Changes (pdf file) was held from 15 October to 12 November 2010. 25 representations were received in total, many of which were duly made (relating to proposed changes and received with the four week consultation period), although others were not relating to changes and/or were received after the 12 November. These have now been forwarded to the Inspector for consideration as part of the examination into the soundness of the Core Strategy. A Summary of Responses to Additional Consultation and all of the representations received (duly made and non-duly made) can be downloaded below.
List A – Duly made representations concerning Proposed Changes since Publication
Downloadable documents
All documents open in a new window.
| File name | Size | Download time |
|---|
| Summary of Responses to Additional Consultation in PDF format | 37 KB | 10 secs @ 28.8k, 5 secs @ 56k |
| 1. Maidenhead Civic Society in PDF format | 59 KB | 17 secs @ 28.8k, 8 secs @ 56k |
| 2. Savills Plc for Land Securities Taplow in PDF format | 399 KB | 1 mins 51 secs @ 28.8k, 57 secs @ 56k |
| 3. Barratt Homes North London in PDF format | 717 KB | 3 mins 19 secs @ 28.8k, 1 mins 42 secs @ 56k |
| 4. BBOWT in PDF format | 253 KB | 1 mins 10 secs @ 28.8k, 36 secs @ 56k |
| 5. Bucks County Council in PDF format | 59 KB | 17 secs @ 28.8k, 8 secs @ 56k |
| 6. Theatres Trust in PDF format | 51 KB | 14 secs @ 28.8k, 7 secs @ 56k |
| 7. Royal Borough of Windsor and Maidenhead in PDF format | 372 KB | 1 mins 44 secs @ 28.8k, 53 secs @ 56k |
| 8. Denham Parish Council in PDF format | 417 KB | 1 mins 56 secs @ 28.8k, 59 secs @ 56k |
| 9. Defence Estates in PDF format | 1 MB | 5 mins 4 secs @ 28.8k, 2 mins 36 secs @ 56k |
| 10. Chilterns Conservation Board in PDF format | 1 MB | 6 mins 35 secs @ 28.8k, 3 mins 23 secs @ 56k |
| 11. Buckinghamshire Fire and Rescue in PDF format | 100 KB | 28 secs @ 28.8k, 14 secs @ 56k |
| 12. Mr Bhagat Hundal in PDF format | 385 KB | 1 mins 47 secs @ 28.8k, 55 secs @ 56k |
| 13. Chilterns Society in PDF format | 282 KB | 1 mins 18 secs @ 28.8k, 40 secs @ 56k |
| 14. Iver Parish Council in PDF format | 796 KB | 3 mins 41 secs @ 28.8k, 1 mins 53 secs @ 56k |
| 15. English Heritage in PDF format | 317 KB | 1 mins 28 secs @ 28.8k, 45 secs @ 56k |
| 16. Brett Group in PDF format | 262 KB | 1 mins 13 secs @ 28.8k, 37 secs @ 56k |
| 17. PJSA (representing various landowner interests) in PDF format | 374 KB | 1 mins 44 secs @ 28.8k, 53 secs @ 56k |
List B – Other representations received which do not relate to the Proposed Changes
Downloadable documents
All documents open in a new window.
List C – Non-duly made representations received after the consultation period
Downloadable documents
All documents open in a new window.
Contact Information
If you have any further queries and wish to discuss any of the above with officers, please contact the Planning Policy team:
Tel:01895 837315, 01895 837247, 01895 837278 or 01895 837298
Fax:01895 837269
Email:LDF@southbucks.gov.uk